Answering the Questions:

1- What does it do?

  • Read soil moisture and irrigate the plant.
  • Sense water level in tank and show level.
  • Manual and automatic irrigation using phone app.
  • Nice to have features:
    1. AI assistance to help take care of the plant.
    2. More readings and sensing.
    3. Modularity and adding more plants.
    4. Lighting using neopixel.
    5. Interactive screen.

    2- Who's done what beforehand?

  • Titul de la web: Only Sensing.
  • Leire Bereziartua: Modularity, solar energy powering, self irrigation, web interface.
  • Ibrahim Alzoubi: Self irrigation large pot.
  • Ismael LB: Step response.
  • Nagi Abdelnour: Automated Lightning and Watering.
  • Pablo Pastor: Smart integrated Pot.
  • 3- What parts and systems have you tried and what will be made?

    What I have tried is the following and what's left will be covered next.

  • Read soil moisture and irrigate the plant.
  • Sense water level in tank and show level.
  • 4- What materials and components will you use? How much the project will cost?

    5- What tools and processes will you use?

  • 2D and 3D design
  • 3D printing
  • Vinyl Cutting
  • Electronics Design
  • Programming - Communication , Wi-fi
  • PCB Milling
  • 6- list the tasks to be completed. make a schedule for doing them.