the site is under a design upgrade, some of the weekly pages are still with the old design, sorry for that.

week 1: principles and practices, project management (Jan 23)


this week i built a web site and made a proposal for a final project.

week 4: electronics production (Feb 13)


design, make, and document a Printed Circuit Board.

week 7: molding and casting (Mar 6)


design a 3D mold, machine it, and cast parts from it.

week 10: input devices (Mar 27)


measure something: add a sensor to a microcontroller board that you've made and read it.

week 13: output devices (Apr 17)


add an output device to a microcontroller board and program it to do something.

week 16: applications and implications (May 8)


plan and document a final project that integrates the range of units covered.


week 2: computer-aided design (Jan 30)


this weeks assignment was supposed to be pretty simple, since CAD is a thing that i know. the problem was, my final project doesn't actually include fabricated parts yet(!)

week 5: 3D scanning and printing (Feb 20)


print in 3D a scanned object and a software designed object.

week 8: embedded programming (Mar 13)


read a microcontroller data sheet, program your board to do something.

week 11: composites (Apr 3)


design and make a 3D mold, and produce a fiber composite part in it.

week 14: networking and communications (Apr 24)


build a wired and/or wireless network with at least two nodes.

week 17: invention, intellectual property, and income (May 15)



develop a plan for dissemination of your final project.

week 19: final project presentation (May 29)