Skip to content

Roadmap

Deadlines

  • Global structure prototype, without disk dispenser for test deployment: November 2025
  • Three fully functional device: April 2026

Conception

  • Funnel design
  • Funnel and tube assembly
  • Grid design
  • Disk dispenser design
  • Electronics requirements definition

Version 1

  • PCB design
  • PCB manufacturing
  • PCB testing
  • Disk dispenser assembly
  • Disk dispenser test
  • Global assembly
  • Global testing

Version 2

  • PCB redesign
  • PCB manufacturing
  • PCB testing
  • Disk dispenser redesign
  • Disk dispenser assembly
  • Disk dispenser test
  • Global assembly
  • Global testing