18 : Invention, Intellectual Property and Income<
Assignments<
This einteenth week's asignments are :
- Individual :
- Develop a plan for dissemination of your final project.
- Complete your final project, tracking your progress.
Dissemination Plan<
It is not in my plan for now to disseminate my final project widely. However, I consider to share my work publicly in the scientific literature as a frugal method to measure fog liquid water content. The article is not written yet and should be written in the following months as a part of my PhD thesis. This consideration made me develop the project in a way that could easily be reproduced hence I used an already existing Open Source framework : the Open UC2 toolbox.
End of project report<
What tasks have been completed and what tasks remain ?<
The completed tasks are :
- Develop a functional measuring instrument
- Integrate it to the existing test bench
- Verify it can run for an hour
- Develop an interface that display live data
- Develop an interface that allows data to be stored
The remaining tasks are :
- Calibrate correctyly the instrument
- Verify that its measurments are repeatable
- Verify it can run for more than an hour
Future possibilities<
The future possibilities are to measure scattered angles signals. It was not expected I could already measure one for this project but I already started implementing this feature. These signals would allow the user to characterize the fog droplets sizes distribution.
What's working ? What's not ?<
The global measuring instrument is working : both signals are readable and coherent.
The calibration is not done yet : the absolute values are not yet meaningfull and the "zero" of the scattered signal is not working well.
What questions need to be resolved ?<
How to calibrate correctly the instrument ?
Planned what will happen when ?<
Not precisely but the instrument will be improved throughout my PhD thesis.
What have you learned ?<
A lot ! Each learning outcomes can be found at the beginning of each week's documentation.