Qrc bunn dbc

Quick-Reference Operator Card: BUNN Dual SH (Soft Heat) DBC Coffee Brewer

⚠️ WARNING: SCALDING 200^\circ\text{F} WATER, HIGH-VOLTAGE & CLEANING HAZARDS

  • PREVENT OVERFLOWS: NEVER start a brew cycle into a server that already contains coffee.Always empty and rinse the Soft Heat server completely before docking.
  • DRIP-OUT DELAY: Hot water continues draining through the coffee bed for up to 60\text{ seconds}after the sprayhead stops. Wait for the electronic Funnel Lock to release and dripping to stop completely before removing the funnel.
  • ELECTRICAL & WATER SAFETY: Hardwired 120/208 - 240\text{ VAC}, 30\text{ A} circuit—never open side/front access panels. NEVER submerge Soft Heat servers in water or clean the brewer with a water jet or pressure washer.

Pre-Flight & Daily Operating Checklist

  • [ ] DISPLAY READY: Confirm the front LCD screen reads READY TO BREW (185^\circ\text{F} - 203^\circ\text{F} tank setpoint; initial heat-up takes \approx 20\text{ minutes}).
  • [ ] SPRAYHEAD INSTALLED: Verify the sprayhead disc is threaded finger-tight onto the brew station (never operate with the sprayhead removed).
  • [ ] SERVER EMPTY & DRY: Confirm the Soft Heat server is 100% empty, wipe the rear electrical docking pins dry, and slide the server firmly against the docking station contacts.
  • [ ] FILTER & COFFEE BED: Place a single genuine BUNN commercial paper filter inside the Smart Funnel (never double-filter or fold edges), add weighed drip-grind coffee, and gently shake horizontally to level the bed.

Standard 6-Step Batch Brewing Workflow

  1. DOCK EMPTY SERVER Verify the Soft Heat server is completely empty and seated firmly against the rear docking station pins.
  2. LOAD SMART FUNNEL Insert one paper filter, add weighed coffee (4 - 5\text{ oz} for 1/2\text{ gal}; 8 - 10\text{ oz} for 1\text{ gal}; 12 - 15\text{ oz} for 1.5\text{ gal}), level the bed, and slide the Smart Funnel fully into the funnel rails.
  3. ENABLE BREW STATION Verify the station’s ON/OFF (ENABLE BREW) switch is ON.
  4. SELECT BATCH SIZE Press Small (1/2\text{ gal}), Medium (1\text{ gal}), or Large (1.5\text{ gal}) (batch size cannot be changed once brewing begins).
  5. START BREW (OR EMERGENCY STOP) Momentarily press and release BREW. (To abort immediately mid-brew, press the ON/OFF (ENABLE BREW) switch).
  6. WAIT FOR DRIP-OUT & DISCARD GROUNDS Wait until the electronic Funnel Lock releases and all dripping stops (\approx 60\text{ sec} after sprayhead shutoff), then pull the Smart Funnel straight out over a sink and discard the wet grounds.

Daily Cleaning & Preventative Maintenance Reference

Component Frequency Approved Procedure Strictly Prohibited
Sprayhead & Outlet Fitting Daily Let cool, unscrew sprayhead, wash with mild soap, and clear upper outlet fitting with long end of deliming key. Operating brewer with sprayhead removed (scalding jet hazard).
Smart Funnel & SplashGard Daily / Between Roasts Discard wet filter immediately; wash funnel with warm mild soap and rinse clean. Leaving wet grounds sitting overnight (breeds mold/rancid oils).
Soft Heat Server & Faucet Daily Empty server, flush with hot water, unscrew faucet wing nut clockwise to brush faucet body & sight gauge; wipe exterior damp. NEVER submerge Soft Heat server in water or use chlorine bleach/steel wool.
Brewer Exterior & Drip Tray Daily Wipe stainless steel with damp microfiber cloth and mild detergent; empty drip tray. NEVER spray with a hose, water jet, or pressure washer.