Final Project
1. System Diagram
Hardware

Software

2. Task List
- Hardware Design
- Confirm core modules (MCU, camera, microphone, speaker, display)
- Design and arrange wiring/connectors
- Power management system design
- Software Development
- Camera data capture
- Basic image processing
- Speech-to-Text (STT) implementation
- Text-to-Speech (TTS) output
- Wi-Fi communication
- Enclosure Design
- 3D modeling of the glasses frame
- Printing and iteration
- System Integration
- Hardware assembly
- Software deployment
- Integration testing
- Final Presentation Materials
- Project presentation slides (PPT)
- Project video recording and editing
- Final documentation (BOM, design files)
3. Project Schedule
| Week | Task | Notes | Status |
|---|---|---|---|
| Week 15 | Hardware Design | Select modules, order components | ✅ |
| Week 16 | Software Development | Develop and test basic functionality | ✅ |
| Week 17 | Enclosure Design | 3D modeling and initial printing | ✅ |
| Week 18 | System Integration | Hardware assembly and debugging | ✅ |
| Week 19 | Final Presentation Preparation | Slides, video, and documentation | ✅ |
4. Checklist
| Task | Completed | Reference |
|---|---|---|
| Prepare a summary slide | ✅ | presentation |
| Create a one-minute video showing: conception, construction, operation | ✅ | presentation |
| Include 2D design | ✅ | enclosure |
| Include 3D design | ✅ | enclosure |
| Use additive fabrication process | ✅ | enclosure |
| Use subtractive fabrication process | ✅ | enclosure |
| Design electronics | ✅ | hardware |
| Produce electronics | ✅ | hardware |
| Interface with embedded microcontroller | ✅ | software |
| Program the embedded microcontroller | ✅ | software |
| Integrate all systems | ✅ | intergration |
| Package the final system | ✅ | intergration |