Date | Day | Task |
---|---|---|
15/May | Thursday | Local β W13(FP Schedule) β + W14(Documentation)β + w15 (Practice) β | Global β W5 (Slicing Setting)c | Final Project β Finish Fiber Glass Resin tubes β |
16/May | Friday | Local βw15 Hardware | Documentation β + W16 (Practice) | Global β TBC | Final Project β open rocket software and to draw the block diagram β |
17/May | SaturdayΒ | Local βW16 Documentation | Global β TBC | Final Project β Simulate the Design With fluid analysis |
18/May | Sunday | Local βW18 Documentationβ | Global β TBC | Final Project β Fusion 360 to make the design fabricable based β |
19/May | Monday | Local βW19 Documentation | Global β TBC | Final Project β Fusion 360 to make the design fabricable based β |
20/May | Tuesday | Local βW20 Documentation | Global β TBC | Final Project β Fusion 360 to make the design fabricable based β |
21/May | Wednesday | Local βQ4 Documentation | Global β TBC | Final Project β Laser cut the engine Mounter and Fins Center Rings β |
22/May | Thursday | Local βQ4 Documentation | Global β TBC | Final Project β Laser cut the finsβ |
23/May | Friday | Local βQ4 Documentation | Global β TBC | Final Project β Mount the fins on the fiber glass tubeβ |
24/May | SaturdayΒ | Local β W17 CNC Metal | Global β TBC | Final Project β Mount the PVC engine and make sure it is stable with a lock ring |
25/May | Sunday | Local β W17 CNC Metal | Global β TBC | Final Project β 3D print the space ship nose |
26/May | Monday | Local β W17 CNC Metal | Global β TBC | Final Project β Sand the nose and fill it and sand again then paint it with acrylic paint |
27/May | Tuesday | Local β W17 CNC Metal | Global β TBC | Final Project β design the mother board of the starship |
28/May | Wednesday | Local β W17 CNC Metal | Global β TBC | Final Project β design the mother board of the starship |
29/May | Thursday | Local β W17 CNC Metal | Global β TBC | Final Project β Design and build the mechanical Parachute Deploymen |
30/May | Friday | Local β W17 CNC Metal | Global β TBC | Final Project β Design and build the mechanical Parachute Deploymen |
31/May | SaturdayΒ | Local β W17 CNC Metal | Global β TBC | Final Project β Test the Deployment mechanism |
1/June | Sunday | Local β Q1 check | Global β TBC | Final Project β Make the wire system between stage one and two + Laser cut the Parachute +robe mounting on the parachute |
2/June | Monday | Local β Q1 check | Global β TBC | Final Project β test the parachute + Electronics system +Deployment mechanism |
3/June | Tuesday | Local β check | Global β TBC | Final Project β Design the Launch pad + CNC the Launch pad + 3d print the rail rings and mount them on the spaceship |
4/June | Wednesday | Local β check | Global β TBC | Final Project β Presentation + poster + documentation |