Week 17

  • Category Machine Week
  • Sessions Date
  • Assignment:
      Group Assignment
    1. design a machine that includes mechanism+actuation+automation+application
    2. build the mechanical parts and operate it manually
    3. document the group project and your individual contribution
      Individual assignment
    1. Document the group project and your individual contribution

Fabricating the PCB Milling Machine

For our machine week, our group decided to fabricate the PCB Milling Machine. The idea popped up after having issues with our SRM-20 bed. It was not levelling thus failing to mill boards evenly.The tasks at hand were considered and determined to be the following by my group.

  • Design of the Frame of the machine (Machine Design)
  • esign of the control system of the Machine (Automation)
  • Design of control system actuators (Mechanical Design)


  • In our group we have people with the following background
  • Kamal Kumar Chapagai - Electronics
  • Sonam Deki - IT and Programming
  • Tenzin Dorji - Electronics
  • Pema Yangzom - General for CAD Design and Cutting/Printing
  • Dorji Tshering Drugyel - Generals for CAD Design and Cutting/Printing
  • Thinlay Namgyal - Generals for CAD Design and Cutting/Printing
  • Sangay Penjor - Architect for 3D Design and Cutting/Printing


  • Individual Task

    In our group we distributed the work and I was assigned to design a holder for the machine. I designed the holder in Fusion 360.



      Following is the steps taken to 3D design the holder
    1. Failed

      After asking for the required measurement from the designing team, I sketched the above sketch.


    2. Failed Failed

      After that I extruded and used slot to make the holes in the holder.

    3. Failed

      To make the sides smoother I applied fillet on all sides.

    4. Failed

      Failed

      And this is the final design.


    Assembly

    AFter each member completed their assigned task we assembled it. Below is the images for the group members assebling it.

    Failed Failed

    Failed Failed

    Testing

    Below is a video of the members testing the function of the machine. With all the effort from each team member, the machine making week was a great success and great learning experience.



    Group Assignment

    Here is the link to group assignment.

    Files

    Holder