PROJECT DEVELOPMENT

ASSESSESMENTS

HAVE YOU : INDIVIDUAL TASK COMPLETED
Made a Project Development YES Answer Questions about What´s worked and What need to be ?

NEIL´S LESSON

Index

  1. WEEK TASK : For the week´s assignment the goal is : Made our Project Development and answer basic questions about our Final Project
    1. What´s the Deadline? How much time do I have left?
    2. What tasks have been completed, and what tasks remain?
    3. What has worked? what hasn't?
    4. What questions need to be resolved?
    5. What have you learned?
  2. The Final Project Development Schedule

What´s the Deadline? How much time do I have left?

I present my project in a week so my date is on 14th of June so have everything will to be difficult, for manage my time i made an schedule task in .xls format with the idea to have every processes under control?.

What tasks have been completed, and what tasks remain?

I design and fabricated some things during my week assignments so the task that have been completed or not are :

ABOUT DESIGN PROCESS :

2D PATTERNS

  • Made the 6Faces Parametric Patterns with Fusion 360. (worked) You can see more 2D Design section in my
  • Final Project Process Page.
  • 3D

    CONNECTORS

  • Finnish the diedro connectors for prototype. (For Work)
  • Adaptor (Worked)
  • The Start (Worked)

    THE BOX FOR ELECTRONICS

  • Redesign the Balsa Wood Model (For Work)

    ELECTRONICS DESIGN

  • Design the CO2 board ( Worked at Networking and Communications Week)
  • Design the Output Board and MiniLeds board and Power Supply boards with regulators.
  • Design the Box for assemble the electronics.

    ABOUT FABRICATION PROCESS:

  • Print the Connectors.
  • Print the Box for Electronics
  • Mill the Boards
  • Cut the patterns with Laser Machine (worked)
  • Sew the Kite (worked)

    ASSEMBLED AND TESTERS:

  • Make some flights (worked)
  • Test Electronics

    ABOUT PROGRAMMING PROCESS :

    PROGRAMMING:

  • Make a program for store data sensors at EPPROM memory
  • Make a Program for send the MQ135 sensor data to the Bright Leds
  • Read the EPPROM

    What has worked? what hasn't?

    I worked everything as possible in design i made the patterns, the electronics and some parts such as the connectors but i didn´t finnish the "Diedro Design for integrate the leds, for that reason i designed a cap for adapt the carbon fiber tubes with the Star connector".

    In fabrication time i printed the star connectors and the cap as adapter, printed the box for electronics, milled the boards, cutted the patterns and sewed the Kite so this section is worked.

    What questions need to be resolved?

    The main question for resolve is the Diedro Connectors Design and how it can be usefull for the Kite.

    What have you learned?

    You can see what i learned wiewing my Final Project Process, where i explain what i learned during each processes.Here is the link if you want to know more about it:

  • Final Project Process and here is my vídeo presentation :
  • THE VIDEO PRESENTATION

    THE FINAL PROJECT DEVELOPMENT SCHEDULE

    For manage better the task for do i made a basic final project development schedule with the idea to assign every task in proper dates.This Schedule is also downloable so if you download it you can to see how spent my days during this week.

    WEEK CONCLUSIONS

    This week i was focuss in the develope of my Final Project but make the task was a good way for thing in the future of my prototype and be realistic.