Week 12 Assignments - Mechanical Design, Machine Design
The as-built Inkuity machine.
Group Assignment
The group assignment for this week was in 2 parts:
- Mechanical Design (part 1 of 2)
- Design a machine that includes mechanism + actuation + automation + application
- Build the mechanical parts and operate it manually
- Document the group project
- Machine Design (part 2 of 2)
- Actuate and automate your machine
- Document the group project
Outcomes
The group assignment page for this week is on the 2025 Charlotte Super Fab Lab group site for Week 12 - Mechanical Design, Machine Design.
Individual Assignment
The individual assignment for this week was to:
- Document your individual contribution (to the group assignments)
Outcomes
With a two-person team, it was straightforward to divide the workload along the lines of the two parts of the assignment. We collaborated throughout, but Jeremy focused on mechanical design part (mechanism + actuation) and I focused on the hardware / software part (automation + application).
Highlights included:
- Ideation on project directions
- Backup system (3D printed plotter) hardware and software testing
- Inkuity Automation Control - stepper motor hardware setup and testing
- Inkuity Applicaton Control - software and application development