Tasks & Schedule

Week Tasks Priority Remarks
Week 1-8 Evaluate package design and finalize specifications for the next iteration. Test the first iteration final board’s functionality and performance. High Completed
Week 9 Research and determine the required output voltage for the speakers. Begin integration of camera module into xiao ESP32 S3 board. High Completed
Week 12-13 Test ultrasonic sensors and integrate LED indicators. Develop code for capturing images triggered by presence detection. Integrate camera module and test functionality. High Completed
Week 14-15 Implement networking protocols for transmitting captured images to App. High Ongoing
May 10, 2024 Finalize first prototype by May 6th. High Ongoing
Week 16-17 Establish connection protocols, integrat with indoor doorbell system and test functionality. Medium Not begun
Week 18 Prepare documentation and presentation materials. High Ongoing
- Research solenoidal lock mechanisms and select suitable one. Design and prototype solenoidal lock system. Medium -

If there’s sufficient time available, I’ll proceed with developing the medium priority tasks once I’ve completed the high priority tasks.