|
Week 7: Electronics Design
Group assignment:
- Use the test equipment in your lab to observe the operation of a microcontroller circuit board.
Group assignment:
Abdalla
For the group assignment I will be testing the voltage of the Potentionmeter once we moving it using the multimeter and the oscilloscope respectively,
Multimeter reading
Oscilloscope signals
Multimeter & Oscilloscope