Week 7: Electronics Design

Group assignment:

  1. Use the test equipment in your lab to observe the operation of a microcontroller circuit board.

Group assignment:

Abdalla

For the group assignment I will be testing the voltage of the Potentionmeter once we moving it using the multimeter and the oscilloscope respectively,

Multimeter reading

Oscilloscope signals

Multimeter & Oscilloscope