Develop a plan for dissemination of your final project.

Prepare drafts of your summary slide and video clip and put them in your root directory.

 

Development

The project at this stage will be for exclusive use within the University premises (in fact, it is intended to be used solely for the Architecture Building. Once all emerging issues are solved, including adding future features, there could be a plan to start producing it for different areas of the university and finally, produce it to commercial use.

This will not be in a short time, because every project made within the Fablab is, by current rules, intellectual property of the university and there is not a clear path to overcome this to achieve commercial production. This is something that should be solved by the time the final product is ready.

 

 

Date

07-2022

08-2022

09-2022

10-2022

11-2022

12-2022

01-2023

02-2023

03-2023

04-2023

05-2023

06-2023

07-2023

08-2023

09-2023

10-2023

11-2023

12-2023

01-2024

02-2024

03-2024

04-2024

05-2024

06-2024

Process

Time
(Months)

Month

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Final Project Presentation

3

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Automated Mechanism

3

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Added Features

1

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Final Prototype Presentation

4

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Permits

2

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Production for building

1

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Production for university

5

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Commercial Production

2

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Automated mechanism

The first development to be considered for implementation is the automated mechanism which, ideally, will be able to send a signal to an external motor and open or close a window at will. The prototype design is considering a pinion and rack mechanism to transform the circular movement output coming from the motor into a linear movement.

I have been making some tests with acrylic laser-cut and a step-motor with mixed results. For instance, the rack-and-pinion solution seems to be working just fine. There are some modifications that may be done from to the design such as rounding the rack dents to ease the system movement.

In the step motor area, the system does not have the torque needed to move a full-size window. There are a few solutions that will be tried and eventually implemented, such as using a gear head to let the motor to spin faster and produce more torque to be used.

 

Summary Slide and Video

The summary slide is currently in the root directory. If you wish to see them, please follow the links below:

-         Summary Slide

-         Video

Nueval Checklist

-         Created a dissemination plan for your final project.

-         Outlined future possibilities and described how to make them probabilities.

-         Prepared a draft summary slide and video.