Final Project

All details are in final project documentation . I made this documentation after completing my final project, so I made it based on my memory.

Summery

I tried to work on my project using the weekly assignments. This way, it was easier to complete the project on time.

In previous weeks I was able to design the controller circuit in input week. I was able to do Bluetooth communication between 2 circuits. Made the wings mold in molding & casting week.

I made a new dragon design for wild card week & to use it for the final project. Made some modification to output week circuit to make the dragon circuit. Designed a base for the dragon & laser cut it. Then, made some modifications to the base design.

I combined & modified the codes I used in previous weeks like input week & networking week & this website for DC motor control.

what tasks have been completed, and what tasks remain?

I beleive at this point, everything was completed except making the dragon body with a base that fits it & making some connections for power source. Also, updating the contents of the video & poster.

what has worked? what hasn’t?

Everything was working. I only had to complete making the dragon body & base & some connections.

what questions need to be resolved?

I had to think of a way to power my controller with a 9 volt battery.

what will happen when?

After completing the dragon body & base & some connections, I will need to test my project to ensure that everything is working properly & if everything works properly I will be done.

what have you learned?

I have learnt lots of things like the importance of time & task management. It was a good idea that I started working on my dragon from the beginning & tried to use what had made. Also, I learnt lots of technical skills like designing different things, making & programming my own circuit.