What is the deadline? How much time do I have left?

My project is "FAB DRUM"(electronic drum) ,the dead line for my project is 19th of June, that gives me 16 days to finish my project

What tasks have been completed, and what tasks remain?

Till now I have made the body of my Drum

I finished the 2D design for making the frame for the drum and cut it out on CNC machine

Organised every components needed for my project

Only purchased the Rubber bush that was not available in our Lab

Designed the PCB and milled it out

Designed and laser cutted the pads for my DRUM

Did the trail with my programme

Remaining is to have wire soldering section,3D printing case for attaching PCB board, vinyl sticker .



Then have to Arrange every components and make it work

How will I complete the remaining tasks in time?

I have planned the testing of piezo electric and model and they worked till now. So I hope i am on schedule

What has worked? what hasn't?

Till now everythings working properly. I hope everything works from here after too.

Code works and Sensor is detecting and showing results

What questions need to be resolved?

I tried the sensor with different sounds on the software that I am using but I didn't get the frequency in correct order so here I am checking the frequency level with the threshold of the piezo electric,but I realy need help for this

What will happen when?

All the designs and testing of electronic components are done.So project will be done on time

What have you learned?

How to design, with the end goal in mind

Almost all the fault in electronics can be traced to improper connections, checking continuity will save a lot of time

Always test your designs before making the actual thing

Things don't work out the way you imagined it will

HOME