The dead line for myself is 18-june this is basically the freeze time for my website (i.e: I am not allowed to upload anything to the website after that date).but because my presentation was on 20-june So I have other extra two Days left!
. so that i can try my best to fixe many issue I was remaining withso far every thing regarding to the proof of concept is working include structure of the beehive and electronics with data streaming.
Because of the time limitation i did manage to build my our web and mobile app that a user can use to track his/her honey harvest in simple way so in order to display honey we have in beehive i have used open platfoamthingspeak> so that i can visualize the data we are receiving from the hive.
another thing i have to deal with is improving on outlook of my hive to that it can be attractive and last longer.
The materials that will be needed to make my final project, also like guant chat.
Task | Completed(%) | Date | Process |
---|---|---|---|
SolidWorks Design | 100% | 28-May | Computer-aided design |
PCB Design | 60% | 2-june | Electronic Design |
Laser cutting | 98% | 7-june | Computer-controlled Cuttin |
Embedded Programming | 86% | 10-june | Embedded Programming |
Data collection | 89% | 13-june | Interface and Application |
weight sensor | 94% | 7-june | Input Devices |
ShopBot cutting | 76% | 15-june | Computer-Controlled Machine |
It was a really great experience, tough ride and very sloppy learning curve. looking back at the past 20 weeks, I believe it might take days even to describe what I learned but I will try to summarize it as follows:
On technical side:
On personal side: